Evening All,
Well I'm just sitting here a bit stunned, see I just worked out the cost for bringing all the halyards etc back to the cockpit and rerigging the mast.
That will be around $3,100 thanks! Now how the hell do I get this pass SWMBO!
Progress to date has us at the painting stage.
The raised sea berth is complete and at home I have sorted through the gear from Seaka and ditched a lot of unnecessary stuff.
I have been painting all that could be removed from Seaka, only six items to go and will complete that this week.
I have to do a bit of fibreglassing to seal two stantion bolts in the forward cabin.
We have to remove two unused tracks at the stern and fibreglass up the bolt holes.
The main genoa tracks need to be removed and resealed.
Old cams etc on the cabin roof need to be removed and the holes fibreglassed up. [I need to do this to complete the inside painting]
That should do us for this week but I may get an undercoat of two pack on the forward cabin if the temperature stays below 25 at the end of the week.