Our new Top Hat Mark 1 has no timer strip on the toe rail, it was removed with the intention of placing on a rubber strip instead. I noticed that there are lots of holes through the GRP tongue where the timber mounted. Are these screws that hold the timber strip on also part of the integrity of the hull to deck joint ? I know there is also adhesive used and the inside cabin the joint is fiberglassed taped as well.
If the screws are not structurally required then I will probably opt for adhesives for the rubber with just the occasional screw. If they are structural then I had better revise the plans.