report on Cool change ....
A lovely top hat that has been dumbed down to a day sailer.
I did my inspection assisted by Dave skipper from sv Bardoo (
www.bardoo.net)
where I am Crewing for the next 5 days around great keppell island.
Are u all waiting .... A first cursory look.....
Yes, she is lovely. I should have take more photos but I had people waiting for me.
1. About 25 mm of water in the bilge. There was even a mouldy measuring stick, so obviously an ongoing problem.
We ran the pump which reduced it to about 15mm. With an outboard in a well shouldn't it be a dry bilge? It seem there are a some problems with the windows, and that the rubber was pulling away and the water came from there. It was fresh water.
2 in head, 3 x 4cm circles of paint was peeling off to reveal a repair had been done at some time, which was just visible on hull as an an area of duller paint. Maybe that was what initiated the new fitout? Fibre glass appeared fine, but paint wasn't adhereing.
I intend to make an offer in next few days.
but I have to budget for ...
New standing and running rigging after transport back to brisbane
Transport and lift on and out
Surveyor
Replace Thu hull fittings while out
Touch up antifoul
My mooring and tackle
3 outboard leg had some area of corrosion. May or may not be serious.
Soonish .....
bimini and solar panels and wiring
Roller furler and sail modified
Stay tuned for next installment .....